Works were carried out for the construction of the outdoor gym, the construction of the perimeter access to the pool, the construction of retaining walls and stands, the construction of piles, including urban planning works, pavements, installation of paving stones and complementary works. The designed structure corresponds to a series of retaining walls surrounding the pools, among which there are elements with passive anchors, beams and foundation shoes. Additionally, a building was built whose use will be the reception for the gym area with a metal structure and a pre-mixed concrete access road for access to the swimming pools and the soccer field. The project also carried out the construction of a pedestrian bridge in a metal and concrete structure, pedestrian paths and the supply and installation of street furniture including solar energy lamps.
Todos los derechos reservados AARCON.