Construction of rainwater and wastewater collector

Florida, Pereira

The object project was part of the current development plan by the Mayor's Office of Pereira in its strategic line of EFFICIENT PUBLIC SERVICES and the WATER AND ENVIRONMENTAL SANITATION subprogram in order to guarantee the environmental quality of the municipal territory. The scope included the construction of a new storm sewer of 261.46 m with a diameter of 24” and a sanitary sewer of 435.08 m with a diameter of 8” in the district of Florida. Additionally, 7 connections of household wastewater networks and the construction of 16 boxes and/or inspection wells were made. The average depth of the excavations for the installation of the collectors was 3.00 m. Finally, the paving of 346.54 linear meters of M.R 4.2 concrete was carried out with an average width of 3.36 m, with a thickness of 0.25 m.

EXECUTION TIME

2019-2020

Photo gallery

Related projects

Antonia Santos Life Center – Bucaramanga

Opening of roads in Santa Fé de Antioquia

Construction of rainwater and wastewater collector

THEY TRUST US: