Construction of works to improve passability on secondary and tertiary roads

Risaralda

The project consisted of the road improvement of roads in several municipalities of the department of Risaralda distributed in 9 simultaneous critical points. Mass and fill removal works were carried out to stabilize the road axes through reinforced concrete structures such as retaining walls, energy dissipators, gutters, piles, piles, and coated gabions. Likewise, water conduction works were carried out through box culvert-type structures and pipes with diameters of up to 80 inches; finally, paving and urban planning works were carried out.

EXECUTION TIME

2020