The project consisted of the rehabilitation of the access roads and maneuvering yard inside the Incolmotos Yamaha Factory. Demolition of the existing pavement was carried out, removal of the existing granular base to be replaced with a new layer and subsequently compacted for installation
All rights reserved – AARCON.