System for wastewater treatment and networks in La Herencia condominium

Studies, design and construction

Tebaida, Quindío

The project consisted of the construction of a domestic wastewater treatment system. For this purpose, a grease trap, a septic tank, an anaerobic filter and an absorption well were built in accordance with the characteristics revealed by the percolation test.

EXECUTION TIME

2019/2020

Photo gallery

Related projects

Antonia Santos Life Center – Bucaramanga

Opening of roads in Santa Fé de Antioquia

Construction of rainwater and wastewater collector

THEY TRUST US: