Construcción colector de aguas lluvias y residuales

Florida, Pereira

The object project was part of the current development plan by the Mayor's Office of Pereira in its strategic line of EFFICIENT PUBLIC SERVICES and the WATER AND ENVIRONMENTAL SANITATION subprogram in order to guarantee the environmental quality of the municipal territory. The scope included the construction of a new storm sewer of 261.46 m with a diameter of 24” and a sanitary sewer of 435.08 m with a diameter of 8” in the district of Florida. Additionally, 7 connections of household wastewater networks and the construction of 16 boxes and/or inspection wells were made. The average depth of the excavations for the installation of the collectors was 3.00 m. Finally, the paving of 346.54 linear meters of M.R 4.2 concrete was carried out with an average width of 3.36 m, with a thickness of 0.25 m.

TIEMPO DE EJECUCIÓN

2019-2020

Galería de fotos

Proyectos relacionados

Centro de vida Antonia Santos – Bucaramanga

Apertura de vías en Santa Fé de Antioquia

Construcción colector de aguas lluvias y residuales

CONFÍAN EN NOSOTROS: